Chinanews.com, Harbin, November 11 (Reporter Shi Yifu) On the 6th, most of the Northeast ushered in heavy snowfall and bad weather, and there was a heavy snowstorm locally. In order to ensure the absolute safety of passenger train operation, China Railway Harbin Bureau Group Co., Ltd. has taken measures such as passenger train suspension and adjustment of operation sections to scientifically adjust the transportation plan according to the snow conditions, and has organized the suspension of 6 passenger trains in Harbin, Qiqihar, Jiamusi, Qitaihe, Suifenhe and Shenyang, Dalian, Changchun, Jilin, Shijiazhuang and other directions outside the province.

Some of the vehicles that have been discontinued are as follows:

On November 11, the G6/1239/8 from Shuangyashan West to Shijiazhuang ran to Harbin West Railway Station, and the G9/1238 between Harbin West and Shijiazhuang stopped running.

On November 11, G7/1240/37 from Shijiazhuang to Shuangyashan West was suspended.

On November 11, the D7/7989 from Shuangyashan West to Harbin was suspended.

On November 11, the G6 from Jixi West to Beijing Chaoyang arrived at Harbin Station, and the operation between Harbin and Beijing Chaoyang stopped.

On November 11, G7 from Beijing Chaoyang to Jixixi was suspended.

On November 11, D7 from Jixi West to Harbin West was suspended.

On November 11, the G6/2634 from Qiqihar south to Heze East ran to Changchun West, and stopped running from Changchun West to Heze East.

On November 11, the G7/2636 from Hezedong to Qiqihar South was suspended.

On November 11, the D7 from Qiqihar to Harbin was suspended.

On November 11, the G6 from Harbin West to Dalian North was suspended.

On November 11, the G6 from Dalian North to Harbin West was suspended.

On November 11, the G6 from Jiamusi to Dalian North arrived at Harbin Station, and the operation between Harbin and Dalian North was stopped.

On November 11, the G6 from Dalian North to Harbin West was suspended.

On November 11, the G6/3643 from Shuangyashan West to Beijing Chaoyang ran to Harbin Station, and the operation between Harbin and Beijing Chaoyang stopped.

On November 11, G7/3641 from Chaoyang, Beijing to Shuangyashan West was suspended.

On November 11, the D7/7947 from Shuangyashan West to Harbin was suspended.

The railway department reminds that passengers who have taken the train or have purchased tickets for the suspended section of the train can go through the refund and change procedures in accordance with the relevant passenger transport regulations of the railway. If the train is affected in the future, passengers should pay attention to the station and train announcement or call the 12306 customer service hotline to inquire about the train information and make proper travel arrangements. (ENDS)