RIA Novosti informs about this with reference to the Rosenergoatom concern (part of Rosatom).

“On March 22, power unit No. 6 of the Leningrad NPP with a VVER-1200 reactor was put into commercial operation.

The order was signed by the General Director of Rosenergoatom Concern Andrey Petrov, ”the message says.

In September 2020, the head of Rosatom, Alexei Likhachev, announced the launch of a new unit of the Leningrad NPP-2 in October.